No. |
Title |
Location |
Description |
1 |
Al-Muhaisen Holding |
Al Khobar - KSA |
An office building comprising 4 basements and 14 floors
above ground with a total built up area of around 30000 m˛.
Handled the design of the MEP systems and tender documents. |
2 |
Institute of Telecommunications |
Angola |
A site comprising administration building, academic block,
auditorium, residential accommodations and ancillary
services building. Total built-up area 8000 m2. Handled the
design of the mechanical systems and tender documents and
supervision of the works. |
3 |
ABC Mall |
Achrafieh- Beirut |
A large commercial shopping mall facility accommodating
retail shops, ABC Store, anchor stores, restaurants,
cinemas, parking floors and ancillary facilities, with a
total built up area of around 110,000 sq. m. Handled the
design and supervision of all MEP systems which included
central chilled water plants, mall floor cooling, sprinkler
fire fighting and smoke exhaust systems. |
4 |
ABC Baytarian Parking |
Dbayeh-Lebanon |
A parking building consisting of 6 levels and an open parking terrace floor, having a total built up area of around 11,350 m². Handled the design of the MEP works and tender documents and the supervision of the works. |
5 |
ABN- AMRO Bank Headquarters |
Beirut- Lebanon |
Four floors of office spaces located in the AMRO bank
building in Achrafieh. Handled the design of the mechanical
systems and tender documents and supervision of the works |
6 |
ABN Amro Bank Branches |
Baabda,Bab Edris,Kaslik and Verdun |
Renovation of the bank branch. Handled the design of the MEP
systems and tender documents and supervision of the works. |
7 |
Administration Building in
Kuwait International Airport |
Kuwait City-Kuwait |
Civil aviation administration building within the premises of Kuwait International airport with a built-up area of 70,000 m2. Handled the design of the MEP works and of the external works and the tender documents. |
8 |
Al Ajami Restaurant |
Beirut- Lebanon |
Renovation of the exisitng Ajami residential apartment.
Handled the design of the MEP systems and tender documents
and supervision of the works. |
9 |
Algeria Gulf Bank-AGB |
Algiers-Algeria |
Headquarters building for Algeria Gulf Bank consisting of a 25 storey twin towers with a total built-up area of 53,000 m2. Handled the design of the MEP works and of the external works and tender documents.All documents produced in French |
10 |
Al Muhaisen Holding |
Al Khobar –KSA |
An office building in Al Khobar consisting of 4 underground
basements, ground floor with commercial facilities and 14
office floors, of a built up area of around 39,000 m2.
Handled the design of MEP systems and tender documents. |
11 |
Al Shallal Theme Park |
Jeddah-KSA |
A theme park with a footprint of 350,000 m2 and comprising a
24,000 m2 sea water enclosed lagoon, indoor and outdoor game
facilities and a 4000 m2 above ground parking. The indoor
game and theme facilities are housed within two separate
buildings: the singles building with an area of 800 m2 and
the main building with an area of 16,000 m2. The latter
houses an indoor ice rink, an Amazon Theme area, two power
game zones, three carrousels, four party rooms, a theater
and food and beverage facilities comprising five fast food
and seated restaurants with their kitchens. The outdoor game
and theme facilities include a European Village theme, a Far
Eastern Village theme, a Lebanese Restaurant, a number of
snacks and kiosks in addition to a variety of rides
comprising simulators, roller coaster, boat rides etc. The
total cooling load is 1670 tons of refrigeration with a
central cooling plant utilizing absorption chillers and sea
water condenser cooling system.Handled the design of the MEP
systems and tender documents. |
12 |
Arab Bank Headquarters |
Amman-Jordan |
Headqaurters of the Arab Bank in Amman.Heating and
air-conditioning systems, involving air-cooled refrigeration
plant of 400 tons of refrigeration and incorporating a
variable air-volume system for office space
air-conditioning. Handled the design of the mechanical
systems and tender documents and supervision of the works. |
13 |
Arab League Headquarters |
Tunis-Tunis |
A public office building with a total built-up area of 38
000 m˛. The air-conditioning system is a central chilled
water system with centrifugal, water-cooled chillers of
total capacity of 1200 tons of refrigeration. Handled the
design of the mechanical systems and tender documents and
supervision of the works. |
14 |
Arab Potash Company Building |
Al Aqaba-Jordan |
A five-floor office building involving air-cooled
air-conditioning plant of 110 tons of refrigeration. Handled
the design of the mechanical systems and tender documents
and supervision of the works. |
15 |
Armoured Brigade Camp |
Jordan |
A military camp. Handled the design of the mechanical
systems and tender documents. |
16 |
Azaiba and Ibri Work Centre Accommodations |
Muscat-Oman |
Accommodation for workers, 3000m˛ built-up area, consisting
of bedrooms and food centre facilities. Air-conditioning
system consisting of room air conditioners, and plumbing
system incorporating the drilling of a water well. Handled
the design of the mechanical systems and tender documents. |
17 |
Bahrain Conference Centre |
Manama-Bahrain |
Handled the design of the mechanical systems and tender
documents and supervision of the works. |
18 |
Bahrain Government Complex |
Manama-Bahrain |
Handled the design of the mechanical systems and tender
documents and supervision of the works. |
19 |
Bahrain Post Office |
Manama-Bahrain |
Handled the design of the mechanical systems and tender
documents and supervision of the works. |
20 |
Bain Militaire New Extension |
Beirut- Lebanon |
Extension of the existing central bain militaire club in Ras
Beirut. Handled the design of the MEP systems and the tender
documents. |
21 |
Bank of Beirut |
Beirut- Lebanon |
Renovation of the bank branch. Handled the design of the MEP
systems and tender documents. |
22 |
Banque Du Liban New Extension |
Beirut- Lebanon |
New extension of the central bank at Hamra consisting of 3
blocks. Handled the MEP design and tender documents and
supervision of the works. |
23 |
Banque Du Liban Renovation Works |
Beirut- Lebanon |
Renovation of part of the main central bank offices. Handled
the design of the mechanical systems and tender documents
and supervision of the works. |
24 |
Beirut International Airport Upgrading |
Beirut- Lebanon |
Project consists of updating the Master Plan and the
development of existing design done by Aeroport de Paris in
1980 for the 6 million annual passenger capacity and the
design of expansion works for long term and short term
implementation. The designs involve the updating of the
96000m˛ terminal building, the construction of a new east
runway and a west runway and the rehabilitation of all
ancillary service buildings. Handled the existing systems
survey and the design of the mechanical systems and tender
documents. |
25 |
Beirut Marina North Quay |
Beirut Central District-Lebanon |
An independent marina facility in Beirut Central District (
Beirut Central District- ) seafront. The Marina accommodates
around 450 large, medium and small sized yachts. Handled the
design of the MEP systems and tender documents including
water and power supply, communication systems,
infrastructure utilities and building services. |
26 |
Beirut Markets - Beirut |
Beirut- Lebanon |
Wholesale and retail markets in Beirut. Project consists
of shops, a cooperative supermarket, underground parking,
and a bus terminal. Handled the MEP and infrastructure
design and tender documents. |
27 |
Blom Bank Beirut and Saida Branches |
Lebanon |
Renovation of the bank branches. Handled the design of the
MEP systems and tender documents and supervision of the
works. |
28 |
CEGP Offices I |
Beirut- Lebanon |
Renovation of exisiting offices spaces. Handled the design
of the MEP systems and tender documents. |
29 |
CEGP Offices II |
Beirut- Lebanon |
Renovation of existing offices spaces. Handled the design of
the MEP systems and tender documents. |
30 |
Concorde Center - Beirut |
Beirut- Lebanon |
Addition of an amusement center to the existing Concorde
center. The additions include two cinemas, one theater, two
amusement centers, one cafeteria, one restaurant and shops.
Handled the design of the mechanical systems and tender
documents and supervision of the works. |
31 |
Consulting Clinics in Beirut |
Beirut Central District-Lebanon |
A private consulting clinics and health facility in the
Saifi Quarter of Beirut Central District. The project
consists of 3 basements used for parking and medical
facilities including 3 operating rooms. 6 floors aboveground
house clinics and patient rooms. Handled the design of the
mechanical systems and medical gas systems, tender documents
and supervision of the works. |
32 |
Dar Al Aytam Office Building |
Beirut- Lebanon |
Renovation of an existing office building. Handled the
design of the MEP systems and tender documents. |
33 |
Doha Car Park No. 1 |
Doha-Qatar |
A combined multi-storey car park, shopping centre and
offices building with a total built-up area of 34,000 m˛.
The air-conditioning system is a central, chilled water, fan
coil unit system, with reciprocating air- cooled water
chillers of total capacity of 790 tons of refrigeration.
Handled the design of the mechanical systems and tender
documents. |
34 |
Ezzeddine Building-(UFA) |
Beirut Central District- Lebanon |
Renovation of an existing office building. Handled the
design of the MEP systems and tender documents. |
35 |
General Headquarters for UAE Armed Forces |
Abu Dhabi-UAE |
A residential and administrative complex for the armed
forces in Abu Dhabi. Air-conditioning system consisted of a
water-cooled central air-conditioning plant of 1650 tons of
refrigeration for main headquarters building and an
air-cooled system for each ancillary building.Handled the
design of the mechanical systems and tender documents and
supervision of the works. |
36 |
Gebran Tweini Memorial |
Beirut Central
District-Lebanon |
Landscape design of outdoor memorial area, including special lighting effects, rainwater drainage and irrigation. Handled the design of the MEP works related to landscape design and the supervision of the works. |
37 |
Government Complex, Angola |
Angola |
Government buildings including council of ministers,
ministry of defence and supporting buildings. Total
built-up area 130 000 m2.Handled the design of the
mechanical systems and tender documents and supervision of
the works. |
38 |
Hajj Security Operations Post, |
Makkah-KSA |
An Army building with an area of 20000m˛, consisting of
dormitories, offices, control towers, computer and
surveillance rooms, 540 tons of refrigeration consisting of
air-cooled chillers, air- handling units, fan coil units
combined in a primary-secondary chilled water system and a
plumbing system incorporating a special fire-fighting Halon
system. Handled the design of the mechanical systems and
tender documents. |
39 |
Hindi Building II |
Jeddah-KSA |
An office building and shopping centre, with a built-up area
of 12000m˛, 600 tons of air-conditioning consisting of
air-cooled chillers, fan coil units and air-handling units
and plumbing system incorporating a swimming pool. Handled
the design of the mechanical systems and tender documents. |
40 |
Hippodrome de Beyrouth |
Beirut- Lebanon |
Renovation of the administration section of the Hippodrome
de Beyrouth. Handled the design of the MEP systems and
tender documents. |
41 |
Housing Bank Complex |
Zarqa-Jordan |
A combined office building and shopping centre with a total
built-up area of 7500 m˛. Handled the design of the
mechanical systems and tender documents. |
42 |
Le Grand Theatre |
Beirut Central District- Lebanon |
An existing 5 storey building in Beirut Central District
which used to house the famous Grand Theatre of Beirut with
a built up area of around 6,000 sq. m. Handled the design of
the MEP systems on a shell design basis and tender
documents. |
43 |
Le Notre Restaurant |
Riyadh – KSA |
Fitting of the Le Notre Restaurant in Jeddah. Handled the
design of the MEP systems and tender documents. |
44 |
Madinah Hajj Station, Mosques |
Madinah-KSA |
Three mosques in Madinah. Handled the design of the
mechanical systems and tender documents. |
45 |
Madinah Haram Special Development Zone, Saudi Arabia |
Madinah-KSA |
A 80000m˛ four-storey building facing Prophet Mosque
including parking floor, shopping centre and offices.Handled
the design of mechanical systems and tender documents. |
46 |
Makassed Koura Building |
Beirut Central District- Lebanon |
Renovation of an existing office building. Handled the
design of the MEP systems and tender documents. |
47 |
Makkah Car Parks - APM Workshops |
Makkah-KSA |
Two multi-storey car parks, Kudai and Mahbas Al Gin, with a
total capacity of 8730 cars. An automatic people mover (APM)
linking the Kudai car park to the Holy Mosque entrance
tunnel. A workshop for the APM including maintenance
facilities and garage. Handled the mechanical design and
tender documents of the Kudai car park and the APM workshop
facilities. |
48 |
Medgulf Building No. 1 |
Beirut Central District- Lebanon |
An office building comprising 2 basement floors, ground and
mezzanine floors and 5 office floors with a partial roof
accommodating habitable space. The total built up area above
ground is around 7,000 m2. Handled the MEP design and tender
documents and supervision of the works. |
49 |
Medgulf Building No. 2 |
Beirut Central District- Lebanon |
An office building with 3260 sq. meters underground built-up
area and 8500 sq. meters of above ground built-up area.
Handled the MEP design and tender documents. |
50 |
Mina Slaughterhouse, Saudi Arabia |
Mina-KSA |
A slaughterhouse in Makkah for sacrifice purposes during
Hajj with a total slaughtering capacity of 300 000 sheep
over 84 hours and freezing facilities reaching a capacity of
4000 tons of refrigeration. Total built-up area reached 165
200 m2. Handled the design of mechanical systems and tender
documents. |
51 |
Momo Restaurant |
Beirut Central
District-Lebanon |
Restaurant space within the Beirut Souks on 2 floors plus a basement for kitchen and stores. The area was around 700 m2 plus 500 m2 area for outside terraces. Handled the design of the MEP works and tender documentsand and the supervision of the works. |
52 |
Multi-storey Car Park (No. 3) in Doha |
Doha-Qatar |
A 6-storey car park incorporating an automatic car washing
station. Handled the design of mechanical systems and tender
documents. |
53 |
Muna Heliports Extension, Makkah, Saudi Arabia |
Makkah-KSA |
Two identical heliports with 1500m˛ built-up area each, 65
tons of air-conditioning, each consisting of a variable air
volume system.Handled the mechancial design and tender
documents. |
54 |
Muna Pedestrian Walkway |
Muna-KSA |
A 5 km long pedestrian walkway for pilgrims. The
ventilation system incorporated a system of jet fans along
the walkway to eliminate stale and hot air. Handled the
design of mechanical systems and tender documents. |
55 |
Racheed Karame International Fair |
Tripoli- Lebanon |
An exhibition hall and an administration hall of 10,000 m2
built up area. Handled the design of the mechanical systems
and tender documents and supervision of works. |
56 |
Radar Hill Complex |
Nabatieh- Lebanon |
A multimedia center. Handled the design of mechanical
systems and tender documents. |
57 |
Residential Centre in Laghouat, Algeria |
Laghouat-Algeria |
Residential centre with involving air-conditioning plant of
770 tons of refrigeration. Handled the design of mechanical
systems and tender documents. |
58 |
Riad Solh Parking Design |
Beirut Central District- Lebanon |
Preliminary design fr |
59 |
Rotana Café – Beirut Central District-, Beirut |
Beirut Central District- Lebanon |
Fitting of the Rotana Restaurant in Beirut. Handled the
design of the MEP systems and tender documents. |
60 |
Rotana Café – Damascus |
Damascus- Syria |
Fitting of the the Rotana Restaurant in Damascus. Handled
the design of the MEP systems and tender documents. |
61 |
Royal Squadron Buildings, Queen Alia Airport |
Amman-Jordan |
Built-up area of 7000m˛, 80 tons of air-conditioning
consisting of air-cooled chillers, fan coil units and roof
top units, 3810MBTUH of heating consisting of boilers and
radiators and plumbing system incorporating kitchens and
Laundry. Handled the design of mechanical systems and tender
documents. |
62 |
Saifi Plaza I & II |
Beirut Central
District-Lebanon |
Two office buildings consisting each of 4 basement parking floors, two ground floors of retail areas and 7 floors of open office spaces with a total built up area of around 15,000 m2 each. Handled the design of the MEP works and tender documents and the supervision of the work. |
63 |
Shmaisani Centre |
Amman-Jordan |
Centre comprising an office building and a five-star hotel
(320 bedrooms) with all related facilities such as
restaurants, shopping areas etc. consisting of 840 tons of
refrigeration machines and cooling towers and a
primary-secondary hot chilled water system, a plumbing
system consisting of a 150psi pressure water distribution
system and a high-pressure steam network serving the hotel
kitchens and Laundry. Handled the design of mechanical
systems and tender documents. |
64 |
Silver Star Tower II |
Acra-Ghana |
An office building consisting of 3 basement floors, two ground floors of retail areas and 10 floors of open office spaces with a total built up area of 24,600 m2. Handled the design of the MEP works and tender documents. |
65 |
Smart Project, Bahrain |
Bahrain |
A communication centre, involving reciprocating,
condenserless water chillers with centrifugal air-cooled
condensers of 90 tons of refrigeration. Air-conditioning
system included computer room air-conditioning, and
mechanical services included a halon automatic
fire-extinguishing system. Handled the design of mechanical
systems and tender documents and supervision works |
66 |
SONANGOL Base |
Angola |
Approval of design of mechanical services and
air-conditioning systems of a turnkey residential complex
consisting of housing, kitchen and Laundry and recreational
facility building. Split system air-conditioning and
window-type units are used. |
67 |
SONANGOL Base - Phase II |
Angola |
Workshops, houses and administration offices for oil
companies and for the Ministry of Transport. Handled the
design of mechanical systems and tender documents. |
68 |
Soyo Phase - II - Commissioner's Residential Palace |
Soyo-Angola |
Handled the performance specifications for the design and
installation of the air-conditioning and plumbing works. |
69 |
Souks of Beirut South Parking |
Beirut Central District- Lebanon |
Underground South Parking of the Souks of Beirut consisting
of four underground parking floors. Handled the design of
the MEP systems and tenders documents and supervision of the
works. |
70 |
Souks of Beirut North Parking |
Beirut Central District- Lebanon |
Underground North Parking of the Souks of Beirut consisting
of four underground parking floors. Handled the design of
the MEP systems and tenders documents and supervision of the
works. |
71 |
Souks of Beirut Superstructure - South Parking - Beirut Central District |
Beirut Central District- Lebanon |
All superstuctures located above the underground South Parking and comprising office buildings, commercial centers and recreational centers. Handled the design MEP and infrastructure systems and tender documents and supervision of the works. |
72 |
Stay & Sweet Tea Restaurant |
Beirut Central
District-Lebanon |
The project consists of 2 restaurant facilities in the Souks of Beirut Project, one located in Block K at 2 floor Levels and the second is in Block F also at 2 floor levels with a terrace floor, having a total built up area of around 2360 m². Handled the design of the MEP works and tender documents and the supervision of the works. |